
As part of this programme we were asked to migrate the content for various business functions to the new, globally architected Livelink application. The Human Resource department had been identified as a quick win, and Venture provided the capabilities to migrate globally dispersed HR content, from across three Livelink instances and four windows shares to the new Livelink system.
The existing content, in all its forms, needed to be scanned, file plans created and mappings generated to migrate files into the new Livelink system in the UK.
For some remote locations, the analysis engine was enhanced to generate a delta or difference between multiple scans. This meant that additional time could be allowed during the migration process for tasks such as user training. It also allowed migrations to occur out of hours.
The migration utilities of V-KIT were built for Livelink to create import Xml files to facilitate the loading of content from these systems into the new Livelink HR locations. Further analysis was provided as part of the import validation.
A significant achievement was the management of the business change. A business function of largely non-technical HR users spread across seven countries were persuaded to give up their country based silos of information, and move to a new global information structure, embrace new concepts such as metadata, and adopt an all new system. This was just as significant a challenge as those posed by the technology.
In conjunction with the move to the new system, Venture assisted in developing a ‘philosophy' document around the new structure, explaining to users not only the rules around the new area, but the thinking behind those rules and practices in order to fully engage with HR users on their terms. These are now in place and in full use.
![]()
From advisory services and data management through to EIM, Venture has delivered a wide range of Information Management solutions to BP’s upstream business